๐ฝ๐๐ก๐ค๐ฌ ๐๐ง๐ ๐ข๐ฎ ๐ข๐๐๐ฉ๐๐ฃ๐ ๐ฃ๐ค๐ฉ๐๐จ ๐๐ง๐ค๐ข ๐ฎ๐๐จ๐ฉ๐๐ง๐๐๐ฎ๐จ ๐พ๐ค๐ข๐ข๐ช๐ฃ๐๐ฉ๐ฎ ๐๐๐๐ฉ๐๐ฃ๐ ๐๐ฉ ๐๐๐ฝ. ๐ผ๐จ ๐ ๐จ๐ฉ๐๐ฉ๐๐ ๐๐ฉ ๐ฉ๐๐ ๐ข๐๐๐ฉ๐๐ฃ๐ ๐๐ ๐ฎ๐ค๐ช ๐๐๐ซ๐ ๐๐๐๐๐จ, ๐จ๐ช๐๐๐๐จ๐ฉ๐๐ค๐ฃ๐จ ๐ค๐ง ๐๐ค๐ฃ๐๐๐ง๐ฃ๐จ ๐ฉ๐๐๐ฉ ๐ฎ๐ค๐ช ๐ฌ๐๐ฃ๐ฉ ๐ฉ๐ค ๐๐ค๐ฃ๐ฉ๐ง๐๐๐ช๐ฉ๐ ๐ง๐๐๐๐ง๐๐๐ฃ๐ ๐ฉ๐๐ ๐ฝ๐๐๐๐ ๐๐ง๐ค๐จ๐๐ค๐ฃ ๐๐ฉ ๐๐๐ฝ, ๐ฅ๐ก๐๐๐จ๐ ๐๐ค๐ข๐ข๐๐ฃ๐ฉ, ๐๐ข๐๐๐ก ๐ค๐ง ๐จ๐๐ฃ๐ ๐ ๐ข๐๐จ๐จ๐๐๐ ๐๐ฃ๐ ๐ ๐ฌ๐๐ก๐ก ๐๐ฃ๐จ๐ช๐ง๐ ๐ฉ๐๐๐ฉ ๐๐ก๐ก ๐๐ค๐ง๐ง๐๐จ๐ฅ๐ค๐ฃ๐๐๐ฃ๐๐ ๐ง๐๐๐๐๐ซ๐๐ ๐๐๐ฉ๐จ ๐ฅ๐๐จ๐จ๐๐ ๐ค๐ฃ ๐ฉ๐ค ๐ฉ๐๐ ๐ง๐๐ก๐๐ซ๐๐ฃ๐ฉ ๐จ๐๐๐ฉ๐๐ค๐ฃ ๐ค๐ ๐พ๐ค๐ช๐ฃ๐๐๐ก ๐ฉ๐๐๐ฉ ๐๐จ ๐๐๐๐ก๐๐ฃ๐ ๐ฌ๐๐ฉ๐ ๐ฉ๐๐๐จ ๐ข๐๐ฉ๐ฉ๐๐ง.
๐ผ๐ก๐จ๐ค, ๐ฉ๐๐ ๐๐ค๐ก๐ก๐ค๐ฌ๐๐ฃ๐ ๐ก๐๐ฃ๐ ๐ฉ๐ค ๐ฝ๐๐พ ๐๐ค๐ฌ ๐๐๐จ ๐ ๐๐ช๐ก๐ก ๐๐๐จ๐ฉ๐ค๐ง๐ฎ ๐ฉ๐ค ๐๐๐ฉ๐ ๐๐ฉ ๐ฉ๐ค ๐ฌ๐๐๐ฉ ๐๐๐จ ๐ค๐๐๐ช๐ง๐ง๐๐ ๐ฌ๐๐ฉ๐ ๐ฉ๐๐ ๐๐ค๐ง๐๐จ๐๐ค๐ง๐ ๐๐ฃ ๐๐๐ฝ.
MPB Community Meeting Re Foreshore Erosion 20/06/26
Good afternoon, ladies and Gentlemen,
Thank you for all coming along today to discuss your concerns and to hear what is planned to be done regarding the current Foreshore Erosion that is being experienced at Moore Park Beach.
Council has been monitoring the slow decline of the foreshore for many years and it wasnโt really a problem until Cyclone Alfred went down our coastline in February 2025 and we lost close to 10 meters of foreshore from the foreshore Parklands on Surf Club Drive. The foreshore has continued to erode at an alarming rate since then and we now have 3 areas of major concern.
I will address each of these areas separately and if we can leave questions/suggestions on each area until the end that would be great. There will be ample time at the end for discussion. There is a lot of technical information, so I will be referring to my notes at times.
The 3 areas are Moore Park Creek Mouth, Lassig St Foreshore & Surf Club Drive Foreshore.
1. Moore Park Creek Mouth
Council has re-engaged a specialist coastal engineer to investigate longer solutions for the shoreline and creek outlet interface at Moore Park Beach. In recent discussions, we were presented a brief on the coastal history which is pictured in the slide on the screen explaining the naturally shifting creek mouth discharge, which is most significantly affected by large rainfall events as recently experienced. (March 2026)

As can be seen in the photo, the coastal dynamic is linked to the discharge of the creek mouth which has moved north some 2km since 2012, with alternate discharge points in between. It is these processes that we will be investigating further to determine if an effective Shoreline Erosion Management Plan (SEMP) can consider reinstatement of the creek discharge to the south of the built environment.
There is a degree of scientific and environmental study required to make such recommendations, however it is our intention to pursue this consideration moving forward.
Council needs to be clear that there is a degree of work ahead to land a solution and secure the requisite environmental permits etc and funding to reinstate the Creek Mouth in its original location. These works would need to be designed and constructed in such a way that it is permanent ie rock groins and walls either side.
2. Lassig St Foreshore
Emergency coastal protection works were undertaken at the Lassig St Foreshore area in May this year.
The erosion was driven by recent Burnett River flooding which has increased water flow through the Moore Park creek system and accelerated the northward movement of the creek mouth.
To minimise any further major erosion in the Lassig St area, emergency works were undertaken, which involved relocating existing rock bags from the former surf club area (which suffered major erosion last year) to Lassig Street to create a protective barrier to the erosion scarp at the former four-wheel drive access.
Additional four-tonne rock bags were also installed to construct a small groyne designed to divert tidal forces away from the foreshore. This work seems to be working and staff are continually monitoring this area.



3. Surf Club Drive Foreshore

Council is also preparing for the next phase of coastal protection works, with construction of a trial offshore breakwater scheduled to begin in July.
The structure will consist of more than 260 four-tonne rock bags positioned approximately 80 meters out from the High tide mark, offshore and adjacent Bob Nielsen Park, an area which has been the subject of intense coastal damage over the years.
The trial breakwater is designed to reduce coastal erosion and help protect nearby infrastructure and community assets. The effectiveness of the breakwater will be monitored over a two-year period, with the structure to remain in place if the trial is successful. Working in conjunction with specialist coastal engineers, Councilโs infrastructure and project teams have designed an offshore breakwater as a long-term beach protection measure.

The offshore breakwater will be visible about 90% of the time but would become submerged at highest astronomical tide. The purpose of the offshore breakwater is to dissipate the wave action before it reaches the vulnerable bank.

The proposal has undergone state department review and been approved as a trial.
When the breakwater is constructed, there will also be an additional sand buffer placed along the bank from the existing sand bank out to the breakwater.

Case studies from similar solutions constructed in southern states demonstrate that over time an offshore breakwater can result in greater sand retention.

It is intended that this solution will be trialled over two years under a monitoring program. Pending the success of that trial period the offshore breakwater would become a permanent, long-term solution to protect the public infrastructure fronting Bob Nielsen Park.
Tenders for the Construction of the Breakwater have been called and work is expected/hoped to commence in July.
(Questions taken from the floor)
Thank you everyone for coming along today. I hope that I have been able to inform you of what is planned to be done to manage the beach erosion in MPB.
Regards,
Jason